Memory Walk Installation Pictures


Phase 1 (installed on 3/14/2020)

Phase 1 Slide Show
Initial Layout Initial Layout2 Excavation1 Excavation2 Excavation3 Excavation4
CR-6 Offloading Base Install1 Base Install2 Base Tamp1 Base Tamp2 Sand Install
Sand Smoothing Brick Install Brick Cutting Brick Install Brick Install Brick Install
Sand Filling1 Sand Filling2 Water Container Water Hose Final Tamp Final Step
Final Step2 Finished Walk Finished Walk2 Finished Walk3 Finished Walk4 Finished Walk5
Install Crew Walk Committee Innkeepers Brick Lively Bricks Moleski Bricks


Phase 2 (installed on 10/22/2023)

Phase 2 Slide Show
Extraction1 Extraction2 Extraction3 Extraction4 Extraction5 Extraction6
Brick Cutting Brick Install Brick Dampening1 Brick Dampening2 Corrine Brick Isotopes Bricks
2023 EC Brick Reeder Brick Whiting & Wilcox Bricks Stocklin Brick USDT Bricks Finished Walk


Walt
Back to Memory Walk Page
MaeDae Electric - Complete Electrical Services - 410-999-7719